Installation
Does the air conditioning need to be running during a floor installation?
Yes — the home’s air conditioning should be running before, during, and after a hardwood installation in Florida to hold the interior at normal living humidity.
Installing while the house is at outdoor humidity locks moisture into the assembly, and the floor moves once the AC finally brings conditions down. For new construction, HVAC should be operational and the building dried in before flooring goes down.
This is why we won’t install wood flooring in an un-conditioned Florida home — the climate control is part of the specification, not an optional extra.
We give free in-home estimates across the Gulf Coast. Request one or call (941) 666-0138.
Related answers
How long should hardwood acclimate before installation on the Gulf Coast?
Hardwood should acclimate to the home’s normal, conditioned interior climate before installation — with the air conditioning running — rather than to a fixed number of days.
Read more →How is engineered hardwood attached to a concrete slab?
Engineered hardwood is attached to a concrete slab by full-spread gluing it with a flooring adhesive after the slab has been flattened, moisture-tested, and given the correct moisture-control layer.
Read more →